shopfittingco
Joined: 22 Apr 2015 Posts: 10
|
Posted: Wed Apr 22, 2015 9:06 am Post subject: shopfitters london |
|
|
Ensure that all components are fully assembled prior to installation, this reduces the need for excessive onsite work and aids in troubleshooting. A quality shop fitting project is defined by the little details; whenever possible, where designed elements interface with the existing building, a simple trick is to use templates to aid in fit off on site. This process not only helps in the fit out stage but also reduces the risk of expensive materials being wasted due to miscuts. _________________ joinery manufacturers |
|